Vacancies, May 2026

Supply of Improved Stove production

Bid Advertisement for the Supply of Improved Stove production

Location: Addis Ababa, Ethiopia

Organization: Hanns R. Neumann Stiftung (HRNS)

Deadline: January 23, 2026

Job Description

Technical Specifications and Material Ratios for Improved Stove Construction

1. Stove Dimensions and Design Specifications

The stove shall be constructed according to the following dimensional and structural requirements to ensure durability, efficient combustion, and effective heat transfer.

1.1 Fuel Inlet Specifications

  • Fuel inlet base width: 24 cm
  • Fuel inlet central height: 11 cm

These dimensions are designed to allow sufficient fuel entry while maintaining controlled airflow for efficient combustion.

1.2 Wall Specifications

  • Outer wall height: 24 cm
  • Inner wall height: 22 cm
  • Wall thickness: 6 cm
  • Wall diameter: 62 cm

The wall thickness of 6 cm provides adequate insulation and structural strength, while the height difference between the inner and outer walls supports optimal heat retention.

1.3 Smoke Outlet Specifications

  • Smoke outlet width: 19 cm
  • Smoke outlet height: 7 cm

The smoke outlet dimensions are intended to facilitate effective exhaust of combustion gases while minimizing backflow and smoke leakage.

1.4 Pot Rest Specifications

  • Pot rest hole diameter: 13 cm
  • Pot rest height: 14 cm

These dimensions ensure stable placement of cooking pots and efficient heat concentration on the pot base.

2. Materials and Mixing Ratios

The stove shall be constructed using locally available materials mixed with cement according to the specified ratios to ensure strength, thermal insulation, and longevity.

2.1 Approved Aggregate Materials

Any one of the following materials may be used as the primary aggregate:

  • River sand
  • Red ash / scoria
  • Pumice

2.2 Mixing Ratios (Aggregate to Cement)

Material Type Mixing Ratio (Aggregate : Cement)
River sand 3 : 1
Red ash / Scoria 4 : 1
Pumice 5 : 1

The selected ratio shall be strictly adhered to in order to achieve the desired balance between strength and thermal insulation.

3. Material Preparation Requirements

  • All raw sand, red ash, scoria, or pumice must be sieved using a 3 mm diameter mesh wire prior to mixing.
  • Sieving is mandatory to remove oversized particles and impurities, ensuring uniform material composition and improved bonding with cement.
  • Clean water shall be added gradually during mixing to achieve a workable but non-watery consistency.

4. General Construction Notes

  • Proper curing should be carried out after construction to prevent cracking and ensure long-term durability.
  • The stove should be allowed to dry completely before initial use.
  • All dimensions are measured in centimeters (cm) unless otherwise stated.

Requirements for Bidders

  • Valid business license for the supply of agricultural equipment or related goods.
  • Taxpayer Identification Number (TIN) and VAT registration.
  • Proven track record in providing similar equipment or agricultural supplies.
Required Skills
  • Time management

How to Apply

Submission Deadline and Address

Submission Period: Upto January 23 , 2026 (Monday to Friday, 8:30 AM – 5:00 PM)

Address: HRNS-Ethiopia Office

Bole Sub City, Woreda 6, Addis Ababa, Ethiopia

Note: Late submissions will not be considered.

Submission Guidelines

  • All bids must be sealed and clearly marked with the category being bid for.
  • Each submission should include:
  • Detailed specifications of the items
  • Price offers (inclusive of all applicable taxes)
  • Delivery timeline

Contact for Inquiries

Phone Numbers:
0995676743/0946753594

Email: ethiopia@hrnstiftung.org.

HRNS-Ethiopia reserves the right to accept or reject any or all bids without assigning any reason.

We look forward to your participation!

EthioNGOJobs

Share
Published by
EthioNGOJobs

Recent Posts

Quality Analyst | Oromiya

Location: Oromiya, Ethiopia Organization: Unilever Deadline: May 15, 2026 Job Description Function: Supply Chain Reports to: Site Quality…

10 hours ago

Job opportunities at Unilever Ethiopia

Deadline: May 15, 2026 | Location: Oromiya, Ethiopia

10 hours ago

Project Manager – CIFF

Location: Jijiga, Ethiopia Organization: United Nations Development Programme (UNDP) Closing Date: May 15, 2026, 06:59 AM…

10 hours ago

Job vacancies at UNDP, Ethiopia

Closing date: May 15, 2026 | Location: Jijiga, Ethiopia

11 hours ago

Maintenance Officer

Location: Addis Ababa with frequent field visit, Ethiopia Deadline: May 17, 2026 Job Description Job…

11 hours ago

Programme Consultant

Location:  Addis Ababa, Ethiopia Organization: UN Women Closing Date: May 16, 2026, 06:59 AM Job Description…

11 hours ago